Things about Termite Control Tenting

The Best Guide To Termite Control Tenting


Many new buildings utilize a termicide treated layer of soil surrounding and under the building. This creates an integrated barrier, along with the physical methods mentioned above. The termicide is applied to the soil under the slab and around the footings, pipes, conduits and other structures of the home during construction to make a vertical barrier.

Timber used to construct houses, outbuildings, fences and other outdoor structures can be treated with chemicals. These are commonly referred toas treated timbers and should be considered at the time of designing or constructing the buildings.

How Termite Control Tenting can Save You Time, Stress, and Money.


To successfully incorporate termite barriers into existing buildings, strategic drilling through concrete slabs, porches, flooring and wall footings might be needed, as well as under floor treatment.

Building and Energy recommends only licensed pest controllers execute this work. Chemical baits Strategically placed bait stations can be used to lure termites into a food supply, for example dry wood or paper refuse. About 30 bait stations are needed for a typical house and they need to be inspected regularly to assess termite activity. .

Once the termites are attracted to the bait station, a specific termicide is added that sticks to the termite.

Indicators on Termite Control Tenting You Need To


To take care of termites in the garden, specialised pest managers drill into timber or the trunk of a tree to insert temperature probes which help locate the termite nest.  Despite routine inspections of the garden, termites can still enter the house. In the house, first indicator might be a small discolouration of a wall , followed by warping if wood panelling is used to line the wall.

Take care to investigate the size and nature of the problem in addition to the options available for termite eradication. .

Whichever system you select, it is important to perform regular inspections in particular inspect your house every six months for any obvious signs of infestation. Building and Energy recommends you arrange for an inspection by a licensed pest control operator at least once per year to search for signs of infestation and to undertake any preventative measures. .

Getting The Termite Control Tenting To Work


For existing buildings, where you have already found signs of infestation, chemical treatment is usually the only option for destroying the termite nest. This treatment can include re-establishing a chemical and/or physical barrier and regular inspections to discover any ongoing or new termite action.

Treatment with a termicide directly into tunnels of the nest where termites are known to be active can reduce numbers, but it rarely eliminates the colony entirely unless it's employed in conjunction with another method.

9 Easy Facts About Termite Control Tenting Shown


When buying an existing house, Consumer Protection recommends including a White Ant Certificate clause in the Offer and Acceptance form. This is intended to create certain that the residence is free of termites and there is no structural damage from any prior infestation. A separate fact sheet about the need for timber pest inspections and reports when buying property is available from the Department of Commerce by contacting the Consumer Protection Advice Line on 1300 304 054. .

If you're constructing a new house or building or renovating an existing one you will need to comply with the termite risk management and barrier requirements of the National Construction Code (NCC) and relevant standards. In the majority of cases a building permit will be needed prior to carrying out building work and the facts of the sort of termite barrier should be submitted as part of the building permit application procedure.

Top Guidelines Of Termite Control TechniquesThe smart Trick of Termite Control Techniques That Nobody is Discussing

Termite Control Tenting for Beginners


The NCC requirements intention to reduce the risk of termite damage to main building elements which are mainly the structural elements of a building butdo not include non-structural elements such as cabinet see here now work and furniture.

It is a requirement of the NCC that a lasting notice be permanently fixed to the building in a prominent location, including in a meter box or the like. The notice should indicate the type and method of termite risk management and also the date the system was installed, along with the installers or manufacturers recommendations for the extent and frequency of future inspections.

For specific information about termite protection for a planned new residence, contact a building surveyor, a contractor or builder or a licensed pest control professional.

9 Simple Techniques For Termite Control Technician Job Description


If you've had building work completed in the past six years and the contractor did not provide termite protection as needed by the NCC, you can refer the issue to the Building and Energy.

Plumbing leaks, drainage problems and roof flows should be dealt with quickly, as damp conditions bring termites.

Termite Control Techniques Things To Know Before You Get ThisWhat Does Termite Control Tenting Do?

The Termite Control Tenting Statements


Garden beds and plants must be stored away from direct contact with walls. Hard paving should be substituted.

Leave a Reply

Your email address will not be published. Required fields are marked *